21.07.2015
Technip has been awarded by TAP(1) a Project Management Consultancy (PMC) Services contract, for a project designed to transport gas from the Shah Deniz field to the European market.
TAP project scope includes an approximately 870 kilometer long pipeline, which will start from the tie-in with the TANAP(2) portion of the Southern Gas Corridor project, at the Greece/Turkey border. The pipeline will then go through Greece and Albania, to eventually cross subsea the Adriatic Sea to end in Puglia, Italy, where it will connect to the Italian natural gas network.